The Lower Churchill Project
The Lower Churchill Project is an ongoing hydroelectric project in Labrador, Canada that will have a capacity of 824 MW. C&T Enterprises was contracted to develop the laydown areas on Forteau Point and Shoal Cove for the sub-sea cable transition stations. Additionally, C&T had also been contracted to build a section of road between the muskrat falls generation station and Forteau point transition station to accommodate the DC transmission line.